ASFALTO ESPUMADO PDF

Conferencia Asfalto Espumado. Public. · Hosted by IFUCE Cal Química Mexicana. Interested. clock. Wednesday, April 29, at PM UTC More than a. ¿Qué es el asfalto espumado? Los asfaltos espumados son una técnica que se ha utilizado con éxito en distintos países en la producción de mezclas asfálticas. Thenoux G., Gonzalez A., and Jamet A., “Aspectos constructivos del primer proyecto de reciclado in situ utilizando asfalto espumado,” Revista Ingeniería de .

Author: Bram Gardajin
Country: Belize
Language: English (Spanish)
Genre: Software
Published (Last): 23 March 2018
Pages: 250
PDF File Size: 13.50 Mb
ePub File Size: 1.30 Mb
ISBN: 319-5-95465-219-8
Downloads: 35678
Price: Free* [*Free Regsitration Required]
Uploader: Mehn

El Observador It has been announced by the government a battery of proposals from an extra small party for the Intendencias to cope with the deteriorating state of their ways to the extension of the scheme of PPP Public Private Partnerships to rural roads Source: Huurmanproposed a four parameters model Equation 1 to describe the permanent strain development in unbound granular pavements under traffic.

The maximum particle size of the AP5 is 5 mm, the maximum dry density is 1. After the application of 5, Equivalent Standard Axles ESAsthe sections stabilised with cement only, bitumen only, and the control section all showed large amounts of rutting.

It is very asfaltl that all couples espumsdo in the development of technology in the country have participated, showing interest and commitment to these first test sections in Uruguay are successful. After a week to allow the chipseal to set up, all sections were asaflto with a skim coat of AC10 hot mix covering the top of the chipseal. A total number of approximately 5.

The profiles were used to calculate the vertical surface deformation VSD by asfalgo the original elevation of each transverse profile before loading minus the current transverse profile.

Reciclado con asfalto espumado y cemento

For instance, section B14C10 was built adding 1. Six pavement sections were tested; the variables were bitumen and cement content; one control section with the untreated unbound material was tested.

Once the untreated material was ready the trenches were stabilised with the recycling machine. Research has demonstrated that pavement recycling using foam bitumen reduces energy and oil consumption Thenoux et al.

  CONDROMALACIA ROTULIANA TRATAMIENTO PDF

The H40 is a crushed aggregate of 40 mm maximum size, with specific gravity of 2. It consists of a m long circular track contained within a 1. AustroadsPavement Design: This load level was applied to accelerate the damage of the pavements and to see a clearer difference in the performance of the pavement sections.

Asfalto espumado by Lucio Borelli on Prezi

Although cold in place recycling using foamed bitumen is an attractive alternative to reduce the high quality aggregate supply problem, pavement designers in New Zealand who are trying to use alternative materials are severely constrained by a lack of data on the performance of a range of stabilized materials.

I agree I do not accept.

Finally, this gives rise to future work in calibration of other performance models. A center platform carries the machinery and electronics needed to drive the system. Results showed that surface deflections decreased at sections with higher bitumen contents. Where n is the number of data points, d c is the calculated rutting depth and d mi is the measured average rutting.

Asfalto Espumado

In addition, the figure shows the esumado performance of section B28C10 compared to B00C University of Natal, South Africa. Average rutting By the end of the test little difference was found in the rutting measurements of sections stabilized with foam bitumen and cement sections B12C10, B14C10 and B28C The results correspond to deflections measured before the trafficking of the sections 0 load cycles and after 1×10 6 load cycles. On the one hand, this intervention makes it clear the maintenance backlog that espimado this route of great importance for heavy vehicle traffic at the entrances of Montevideo and to the port.

Thanks to the high yields of the technique is expected to have completed the tasks leaving a strong and flexible for future interventions take place espumdo in the surface layer basis in about a month.

The rutting results were used to develop models to describe the stable and unstable performance of the tested pavements. The approximate thickness of this surface was 20 mm. Accompanying the development of new technologies of cold recycling in situ foamed bitumen, the sion It has incorporated specific equipment for the design of new foam asphalts and evaluation of the characteristics of the processed mixtures. Six pavements were constructed using different contents of bitumen and cement.

  ENSAYO TRIAXIAL UU PDF

The first model described the stable and unstable rutting of the pavement sections while second model only considered the stable phase in where a steady increase in rutting with the number of cycles is observed.

Resources, Conservation and Recycling,16 pp. Fromload cycles after constructing the HMA overlay the rutting increased approximately linearly up to 1. Check your personal services cookies here. Details of the structural design are not presented in this paper, but a mm basecourse combined with a relatively weak MPa subgrade provided a pavement structural capacity close to 1×10 6 ESAs of 80 kN using both the design methods. The same is exposed for several weeks before the asphalt layer is provided as store tread layer.

The figure shows that, as expected, higher VSDs are measured under the wheel paths. Materials and mix design 2. This paper presents a study on the performance of foamed bitumen pavements tested in the Canterbury Accelerated Pavement Testing indoor Facility CAPTiFfor full scale testing of pavements.

This process continued with the addition of equipment and technologies required for their application and hard work in laboratory design all involved.

Pavement Recycling Archives – Bitafal Group

Rutting modeling of stable and unstable behavior. The results showed that 2. After the application of additional accelerated traffic load, section B12C10 started to show surface cracking, while sections B14C10 and B28C10 performed well.

Therefore, the H40 particle size distribution was adjusted using an AP5 crusher dust to bring the aggregate into the recommended grading zone. The results indicated that ITS increases when the bitumen content espumdo up to about 3.