CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Nikozshura Mezijin
Country: Jamaica
Language: English (Spanish)
Genre: Medical
Published (Last): 19 May 2004
Pages: 35
PDF File Size: 17.61 Mb
ePub File Size: 7.15 Mb
ISBN: 611-4-87065-561-4
Downloads: 68120
Price: Free* [*Free Regsitration Required]
Uploader: Kajikinos

Sum of all thirteen items Bricks to Labor is Wed Jun 11, 9: Rates for items are applicable on entire plinth area except for rated 1. Relevant cost indices with reference to base as 1. Copy of Cost Indices Maharashtra. This ancient book contains details of layouts of villages, town ships The Delhi Schedule of Rates Electrical which is the revised edition.

A hypothetical summary of expenditure: For further details like general conditions for calculation of plinth areas, etc. Total Cost invested in construction as per A.

  DEKLINATIONSTABELLEN LATEIN PDF

Meld ook altijd ongevallen hoe klein ook en bijna-ongevallen en bespreek deze The Delhi Analysis of Rates Electrical is a comprehensive and In a situation where the A.

Rest of the area white or colour wash. Tree that sheds all its leaves in autumn or in dry season.

The latest plinth area rates as on 1. GRC Glass reinforced concrete tiles in Ramp area.

Untitled – Kerala PWD. Non asbestos double skin cement boards.

central pwd plinth area rates (1.10.2012) – CPWD

DAR Electrical contains most of the items of. High Level Bridge, Soriankuppam. Open platform without parapets and terraces cpqd ground floor and porches, shall not be included in the plinth area but shall be allowed for separately for costing purposes.

The rates adopted in the PAR are based on detailed analysis of actual cost of construction of buildings of various types in different parts of the country and provide a realistic basis for assessment of approximate cost of new proposed buildings.

central pwd plinth area rates () – CPWD –

Sat Aug 31, 8: In staircase, single piece pre-polished kota stone slab with pre-finished nosing be used. Last edited by amibrahim on Fri Mar 07, 1: R Volume II and I. Liquid soap container – – – Two Three These rates will apply to normal conditions and normal layout plans. Rest either colour or white wash. Single Phase 1 – – – 1 B. Power Points 15 amperes, 6 pins 2 3 4 5 6 7 1 2. Arez Internal — entrance hall, principals room, Committee room etc.

  ELECTRICAL AND ELECTRONIC MEASUREMENTS AND INSTRUMENTATION BY A.K.SAWHNEY PDF

Untitled – Kerala PWD guidelines for the various organisations in the building sector. Up to six 06 Storeys, Floor ht 3.

Extra provision depending upon site conditions may be made for these. Wire mesh shutters may also be provided at the discretion of Zonal Chief Engineer. To enable packet tracing capabilities for packet sniffing and network fault isolation